02 · Win
Engineer-grade submissions, ready before the deadline.
In MEP and ICT, a tender is decided by the documents a consultant can approve. We prepare them with the rigour of the engineer who will read them.

Why it matters
A product that meets the specification can still be rejected: one missing certificate, one unexplained deviation, one comment left unanswered.
We close those gaps before the consultant finds them, so your offer reads as the obvious choice.
What we prepare
Compliance statements
The page consultants read first.
Every clause of the specification set against your product. Each line is marked comply, clarify or deviation, justified, and referenced to the datasheet page that proves it.
- Clause-by-clause compliance table
- Deviations stated with a technical justification
- References to datasheets, drawings and test reports
Technical submittals
A package that is approved the first time.
Datasheets, drawings, certificates, test reports and catalogues assembled in the order the consultant expects, and checked against the specification and the approved-makes list before they leave you.
- Complete material submittal package
- Certificates and type-test reports in order
- Checked against the approved-makes list
Consultant approvals
From first submission to approval.
We prepare the material approval request, answer the consultant's comments point by point, and manage the resubmissions until the product is approved.
- Material approval request prepared
- Point-by-point response to consultant comments
- Resubmissions managed to approval
Technical reviews
An engineer's second opinion.
An independent review of your submittal, or of a competitor's offer. Every gap is listed, referenced to the specification and given a clear action and an owner.
- Gap list referenced to the specification
- Risk rating for each gap
- A clear action for every item
Tender document review
Read before you price.
We read the tender before you commit to a number: the scope, the exclusions, the approved makes, the warranties and the clauses that decide who qualifies.
- Scope and exclusions summary
- Qualification and approved-makes risks
- Clauses to clarify before you submit
The work itself
Two of the formats we prepare. Every document is written by AI agents, then checked line by line by an engineer.
Compliance statement
Section 26 32 13 · Engine generators
Standby power package · Rev. B
| Clause | Requirement | Specified | Offered | Status |
|---|---|---|---|---|
| 2.1 | Prime rating | 1,250 kVA at 50 °C | 1,275 kVA at 50 °C | Comply |
| 2.3 | Sound pressure | ≤ 75 dB(A) at 7 m | 72 dB(A) at 7 m | Comply |
| 2.6 | Base fuel tank | 8 h at 75% load | 8 h at 75% load | Comply |
| 2.9 | Controller | Paralleling, Modbus TCP | Paralleling, Modbus TCP | Comply |
| 3.2 | Alternator insulation | Class H | Class H, rise class F | Comply |
| 3.4 | Warranty | 5 years | 2 years + 3 extended | Clarify |
| 4.1 | Service response | Within 4 hours | Within 6 hours | Deviation |
Technical review
Core switch submittal · ICT
Data hall network · Submittal 07
- R-01Closed
Power supplies
Specification requires N+1 hot-swappable PSUs. Datasheet confirms. No action.
- R-02Action
Uplink ports
4 × 100G QSFP28 specified; submitted model offers 2. Propose the higher SKU before resubmission.
- R-03Open
Support term
Five-year hardware support must be stated on the submittal cover, not in the quotation only.
- R-04Closed
Rack fit
Depth 512 mm fits the specified 800 mm racks with cable management. Confirmed.
How it works
01
Brief
You send the specification, the tender documents and your product data.
02
Read
An engineer reads the requirement in full and flags what decides approval.
03
Prepare
We draft the statement, submittal or review in the consultant's format.
04
Verify
A second check against the specification, line by line, before anything leaves us.
05
Deliver
Ready to submit, before your deadline. We stay with it until it is approved.
Engagement
Leads + Consult includes four technical reviews every month. Additional reviews are scoped per tender.
Leads
Monthly$800/ month · SAR 3,000
- 30–50 matched projects every month
- Project details and verified decision-makers
- Human-verified before every delivery
Leads + Consult
Monthly$2,000/ month · SAR 7,500
- Everything in Leads
- Four technical reviews every month
- Compliance statements, submittals and tender reviews
The rest of the cycle
Introductions
Every engagement starts with a private conversation about your business and the markets you want to win.